Gold and silver mining · Mexico
We extract value from the earth with responsibility towards people and the land.
A 100% Mexican mining company developing the La Mesa gold and silver project in Pueblo Nuevo, Durango, with a firm commitment to safety, the environment and neighbouring communities.
Au · Ag
Gold and silver
250 tpd
Plant design capacity
Underground
Mine
Durango
Pueblo Nuevo, Sierra Madre Occidental
100 %
Mexican company
2024
Year of incorporation
La Mesa Project
A gold and silver project in the Sierra Madre Occidental.
The La Mesa mining unit is located in the municipality of Pueblo Nuevo, Durango. It is an underground gold and silver mine with a leaching plant designed for 250 tonnes per day, which will produce precipitate and doré.
The project is in its development stage and the processing plant is under construction. The site is reached by unpaved roads, and there is a light-aircraft airstrip in the area.
- State
- Durango
- Municipality
- Pueblo Nuevo
- Stage
- Development
- Processing
- Leaching
Schematic location at municipality level.
RenderMine
Underground mine with a main drift and installed lighting; mining will follow the safety plan and the authorized environmental management program.
RenderPlant
Designed on terraces: crushing, ball mill, six agitation tanks, precipitation and smelting to obtain doré.
RenderAccess
Unpaved roads between the mine, the plant and the light-aircraft airstrip.
Process
From the deposit to doré in four stages.
- 01
Exploration and geology
Drilling, sampling and geological modelling to define the mineralised bodies precisely and plan extraction.
- 02
Development and extraction
Preparation of access, works and infrastructure, and underground mining in accordance with the safety plan and the authorised environmental management programme.
- 03
Leaching
Crushing of the ore and recovery of gold and silver by leaching, with precipitation and smelting to obtain precipitate and doré.
- 04
Refining and sales
Precipitate and doré are refined into pure metals to be sold to specialised refiners and buyers, with the traceability and documentation required by law.
Commitments
Concrete commitments to water, land and people.
We see mining as a temporary activity on a permanent territory. These are the commitments we design and build the project with.
Water
Measurement and control of consumption, recirculation at the plant and monitoring of water quality in line with applicable regulations.
Soil and waste
Leaching and mine-waste management systems in accordance with NOM-155 and NOM-157.
Forest and biodiversity
Conservation of the forest outside work areas, plus flora and fauna rescue and reforestation in disturbed areas.
Mine closure
Closure planning from the operating stage, with progressive restoration of areas that reach the end of their useful life.
Community
Regional employment and suppliers as the first option, and ongoing dialogue with authorities and neighboring communities.
Compliance
We develop the project with every permit in order.
Mining concessions
Valid titles before the Ministry of Mines, with timely payment of duties and production reports.
Environmental authorisations
Environmental Impact Statement, land-use change and water and waste permits in accordance with SEMARNAT and CONAGUA.
Safety and explosives
Compliance with NOM-023-STPS-2012 and SEDENA permits for the handling of explosives.
Ejido agreements
Valid temporary-occupation agreements with the ejido.
Gallery
The site and the project.




Site photographs.

Project presentation
Tour the mine, the plant and the sierra in 3D.
An interactive presentation of the La Mesa project: access roads, underground mine, processing plant and doré, based on the project's engineering drawings. Illustrative representation.
Suppliers and contact
Want to work with us?
We welcome proposals from suppliers, contractors and mining professionals.