Skip to content
Sierra Madre Occidental in Durango, project area

Gold and silver mining · Mexico

We extract value from the earth with responsibility towards people and the land.

A 100% Mexican mining company developing the La Mesa gold and silver project in Pueblo Nuevo, Durango, with a firm commitment to safety, the environment and neighbouring communities.

Gold — USD/oz Silver — USD/oz USD/MXN — Market reference ·

Au · Ag

Gold and silver

250 tpd

Plant design capacity

Underground

Mine

Durango

Pueblo Nuevo, Sierra Madre Occidental

100 %

Mexican company

2024

Year of incorporation

La Mesa Project

A gold and silver project in the Sierra Madre Occidental.

The La Mesa mining unit is located in the municipality of Pueblo Nuevo, Durango. It is an underground gold and silver mine with a leaching plant designed for 250 tonnes per day, which will produce precipitate and doré.

The project is in its development stage and the processing plant is under construction. The site is reached by unpaved roads, and there is a light-aircraft airstrip in the area.

State
Durango
Municipality
Pueblo Nuevo
Stage
Development
Processing
Leaching

Schematic location at municipality level.

Process

From the deposit to doré in four stages.

  1. 01

    Exploration and geology

    Drilling, sampling and geological modelling to define the mineralised bodies precisely and plan extraction.

  2. 02

    Development and extraction

    Preparation of access, works and infrastructure, and underground mining in accordance with the safety plan and the authorised environmental management programme.

  3. 03

    Leaching

    Crushing of the ore and recovery of gold and silver by leaching, with precipitation and smelting to obtain precipitate and doré.

  4. 04

    Refining and sales

    Precipitate and doré are refined into pure metals to be sold to specialised refiners and buyers, with the traceability and documentation required by law.

See the full process

Commitments

Concrete commitments to water, land and people.

We see mining as a temporary activity on a permanent territory. These are the commitments we design and build the project with.

Water

Measurement and control of consumption, recirculation at the plant and monitoring of water quality in line with applicable regulations.

Soil and waste

Leaching and mine-waste management systems in accordance with NOM-155 and NOM-157.

Forest and biodiversity

Conservation of the forest outside work areas, plus flora and fauna rescue and reforestation in disturbed areas.

Mine closure

Closure planning from the operating stage, with progressive restoration of areas that reach the end of their useful life.

Community

Regional employment and suppliers as the first option, and ongoing dialogue with authorities and neighboring communities.

Our environmental and social approach

Compliance

We develop the project with every permit in order.

Mining concessions

Valid titles before the Ministry of Mines, with timely payment of duties and production reports.

Environmental authorisations

Environmental Impact Statement, land-use change and water and waste permits in accordance with SEMARNAT and CONAGUA.

Safety and explosives

Compliance with NOM-023-STPS-2012 and SEDENA permits for the handling of explosives.

Ejido agreements

Valid temporary-occupation agreements with the ejido.

Gallery

The site and the project.

View of the sierra in the project area
Sierra Madre Occidental in Durango, project area
Processing plant tanks under construction
Portal of the La Mesa mine

Site photographs.

Project presentation

Tour the mine, the plant and the sierra in 3D.

An interactive presentation of the La Mesa project: access roads, underground mine, processing plant and doré, based on the project's engineering drawings. Illustrative representation.

Suppliers and contact

Want to work with us?

We welcome proposals from suppliers, contractors and mining professionals.